Hey Guys

I have mentioned 5 for LEAD TIME IN DAYS and PROPOSE DELIVERY DATE ticked in VOV8 setting

In sales order the delivery date is fetching as 11.10.2011

ideally it should be 5.10.2011

My question is what are the other factor hte system taking into consideration

ie: 5.10.2011 +((6days))??

Thanks

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member182378
Active Contributor
0 Kudos

1) Please go back to VOV8 and in your sales document type, give "lead days" = 0 (zero) and then create sales order and check the result.

Are you still getting the extra 6 days?

2) These extra days could be coming from the factory calendar assigned to the sales org and or the calendar assigned to the plant.

If there are holidays, the Req deliv. date shall include those days in its calculation.

change them to some standard and then test.

3) In your case, did you get this "Req deliv. date" before entering any material?

That means it is independent of MMR (and thus independent of MRP views).

Please reply with answers to above points.

Edited by: Typewriter on Oct 2, 2011 11:01 AM

Former Member
0 Kudos

Hi Lakshmipathi

What is there in MRP view of material master for the field GR Processing and In-House production.

Its blank

Hi

Please go back to VOV8 and in your sales document type, give "lead days" = 0 (zero) and then create sales order and check the result.

Are you still getting the extra 6 days?

GETTING 04/10/2011

2) These extra days could be coming from the factory calendar assigned to the sales org and or the calendar assigned to the plant.

If there are holidays, the Req deliv. date shall include those days in its calculation.

change them to some standard and then test.

3) In your case, did you get this "Req deliv. date" before entering any material?

That means it is independent of MMR (and thus independent of MRP views).

CORRECT I GET THIS DATE BEFORE ENTERING MATERIAL

Thanks

former_member182378
Active Contributor
0 Kudos

check 2 things -

1. Shipping point

make two fields blank, these fields are - Determine loading time, Determine pick/pack time

IMG>EStructure>Define>LE>.....

2. Route

make two fields blank, these fields are - Transit time, and TrLead time

IMG>LE>BFunction>Route>Define Route....

and then try, by creating a sales order

Lakshmipathi
Active Contributor
0 Kudos

What is there in MRP view of material master for the field GR Processing and In-House production.

G. Lakshmipathi