on 10-01-2011 5:49 PM
Hi all,
I have a scenerio that when we create sales order with reference to the quotation is it possible to change the material in the sales order using Material determination concept.
The customer will enter the Estimated design material code at the Quotation level(Costing will happen based on which Quotation will be submitted to the customer) but in the sales order it needs to be final design material which will be produced and delivered and invoiced to the customer.
Now I need to either change the material in the sales order or system should automatically determine the material when copied from Quotation
Please suggest any way out for the above scenerio.
Hi Karthikeyan,
Either way you can do it
in "T-code:OVRQ" or IMG>S&D>Basic Function>Material Determination>Define Substitution reason
in strategy coloum mention "Blank value Automatic- The Item will be replaced" or
"A-Substitute products are displayed for selection"
strategy coloum is used to indicate if the substitution should be automatic or if the proposed material determination items should be displayed via dialog box for selection.
Regards,
Krishna.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Karthikeyan,
when you creating sales order with refarence to quotation
before creating sales order maintian material determination procedure for material which is mentioned in Qutation
assign material determination procedure to your sales document type
in T-code: OVRQ menttion strategy is "A" foir this it will display dialog box for selection substitute material
now create sales order with referance to QT
once you enter sales doc type/sales org.d.channel/div click on create with ref button
in next screen give qutation number,
clikc on copy
select the substitue material double click on it
it will take you through the sales document with substitute material.
revert back if you have any query.
Regards,
Krishna.
Hi,
create sales order with ref to QT
enter QT number and clcik on copy
automatically it will idsplay another material substitution screen for selection material
(with the help of OVRQ-strategy is A)
check in vb12 -proposed reasonand validity dates for the material
and check strategy for proposed reason mentioned in VB11 (in OVRQ is it "A" or not)
check with copy control also: VTAA
Regards,
Krishna.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.