Background job got cancelled Abap dump

0 Kudos

We have scheduled the background job YMMGR_MATERIAL_AGEINGN1 it cancelled due the abap dump TSV_TNEW_PAGE_ALLOC_FAILED occured as per the dump all the profile parameter are maintained already, but still cancelled

Accepted Solutions (1)

Accepted Solutions (1)

MaheshKumar
Contributor
0 Kudos

Hi

This background job is cancelled because system couldnt able to allocate memory space. Check that other background processe's memory consumption also. If they are consuming more memory this perticular job wont get memory. If this dump repeats for same job for several time u have to look in to tuning of this background job.

Answers (1)

Answers (1)

Former Member
0 Kudos
YMMGR_MATERIAL_AGEINGN1

Its a customized program

TSV_TNEW_PAGE_ALLOC_FAILED

Search SDN/Google with the above keyword OR go through the SAP Note 369726

*Always search your query before posting

Regards,

Nick Loy