Dear Gurus,

suppose one material having QM activate,all the processes have been carried out on regularbasis.

now if a vendor supplies material with no rejection last three months,system should skip inspection lot

material should post the stock to unrestricted not in QC. stock

is it possible in SAP

Siva

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member42743
Active Contributor
0 Kudos

Keep in mind that dynamic modification is not time driven. It is lot driven. You cannot specify any set times.

The only time you can specidy a number of days is for the reset value. The DMR gets reset if NO lots are created in a given time. Each time you get a new lot, the reset date is recalculated.

FF

Former Member
0 Kudos

Hi,

It is possible by using sampling schemes with quality levels and using a dynamic modification rule to update quality level of the material.

former_member212685
Participant
0 Kudos

Dear,

Could you provide me the steps ???Please

Siva