on 09-24-2011 3:38 PM
Hi Friends,
I have one question on Multilevel block planning with Configure to Order with Propagation scenario.
Here is the scenario:
Block planning scope is for Two plants.
1. Plant A - where FG are produced with following characteristics
Product Family Group
Weight per Meter Kg/m
Grade
length
2. Plant B where SFG are produced with below characteristics
Format Type
Profile Dimension
length
Grade
Now the requirement is after production planning run on FG the planned orders are created on plant A resource (for which blocks with relevant characteristics already crated) and dependent demand is generated for SFG and which are produced on Plant B resource(for this also blocks with relevant characteristics already crated)
The characteristics values of Grade and lenght are coming from plant A planned order to Plant B dependent demand,however the values of plant B Format type and Profile Dimension are not coming from Plant A planned orders.
The requirement is to generate Plant B dependent demand with all plant B characteristics and once planning run happens in Plant B dependent demand the correspond planned orders should occupy relevant blocks on Plant B resource.
Note: PDS are been maintained for FG with one SFG as BOM component (for this SFG the dependent demand is created)
It is kind of multilevel block planning scenario with "Configure - to - Order with Propagation" scenario
Kindly let me know any one of you have worked on these kind of scenario and how to handle this.
Thanks in advance,
Krish
Thanks much Santhosh.
Your information was really helpful.
I have awarded you points.
Best Regards,
Krish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Krish,
It is possible. We have done similar scenario in one of the project. You need to use Badi /SAPAPO/ RRP_USEX_PLORD_CREATE . With this badi you need to modify charcterstic of STR(stock transfer request) in the requirements tab to get required details.
Only thing with multilevel block planning we faced some problems some times commited delivery date was not accurate we use to adjust this manually. This with SCM 5.1
For SCM 7.0 there is Macro for charcteristic propogation. Donot have much idea about that.
Regards,
Santosh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Krish,
Name of the badi is /SAPAPO/RRP_SRC_EXIT in this method RRP_USEX_PLORD_CREATE needs to be used.
There sample coding given by SAP in best practices for flat steel. I think there is SAP note available for this.
Rightnow I donot have details. You can use this sample coding to implement your logic.
Regards,
Santosh
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.