Former Member
0 Kudos

Hello friends user states:

I have 2 productions orders with different confirmation

In the order 1001060 I have this screen. The quantity is 336 but in the confirmation I have 630 in confirmed, in the transaction MB51 with the order production only I have confirmed to 294.

Any ideas about it?

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

done

madlercm
Active Contributor
0 Kudos

Hi,

In SAP production orders there are two types of confirmations; one is for an operation (called confirmation), and the other is goods receipt of the produced material into stock (called goods movement).

There is no system link between the two, eventhough logically of course there is one.

So, I guess that in your case the order was opened for the quantity of 336, out of which 294 were GR (goods receipt) in stock.

For any reason a confirmation of 630 was done. By the way, if no special limitations are defined, you can confirm and also GR more than the planned quantity (336).