cancel
Showing results for 
Search instead for 
Did you mean: 

DIP Prfile for invoicing ofSM02 order type by Resource Related Billing DP90

0 Kudos

Dear Guru,

I have configured the complete DIP profile. But the only thning left is "blank-entry for material determination in the DIP profile is the last entry". I don't know about this.

Can you please explain what is blank-entry for material determination in the DIP profile is the last entry.

Many thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Dear,

IN RRB by using SM02 .

The line item created due to the withdrawal of material contains, for example, information about the cost element and the material number. The characteristic "Cost element" and "Material" are relevant for the creation of dynamic items and are therefore copied to the dynamic item. The characteristic "Cost element" is used for material determination. On the level "Material determination" you will find an entry without a material number where the indicator "Direct material" is set. This indicator ensures that the System assigns the material contained in the line item to the dynamic item. On the level "Criteria", it is defined that this type of assignment only occurs if the line item was posted to the cost element in the set CO-PC-MAT. This set comprises the cost elements used to post material consumption. the withdrawal of material was posted under cost element . This cost element belongs to the cost element set CO-PC-MAT. This means that the criteria for the material determination have been fulfilled, and that the material contained in the line item is transferred to the dynamic item.

Regards,

Rambabu