Consideration during Multiple ECC systems with One APO system for PP/DS

Former Member
0 Kudos

Hi All,

We have a scneario that Multiple ECC systems and Third party ERP systems and Legacy systems .What are the points to be considered for this scenario when using with PP/DS?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

The factors to be considered will greatly depend how the multiple ERP systems are split, if they are split on geographical aspects only (all modules in all ERP systems then no major issues) - the problem will become a little challenging when Multiple ERP are split with different modules in different instances then major thought has to go in your CIF design (the IMs has to properly though of ).

It is not a detailed explanation but just the line of thought.

Regards,

Vineet

Former Member
0 Kudos

Vineet,

Thanks for your reply.Our concern is only specific to PP/DS not other modules and we understand the difficulties of CIF.Anything else other than CIF part to be considered for PP/DS?