on 09-17-2011 11:35 AM
Hi Experts
Scenario: We have water as Pipe line material. We have activated 89 inspection type & user is creating manual Inspection lot for the same.
Since this is a Pipe line material, there will not be any PO, GR so no inspection lot at GR. We do the GI with 201-P against the cost centre & vendor.
So my requirement is that, can it be possible to somehow create the inspection lot at the time of above GI OR
Any other way to create the inspection lot apart from creating it manually by Inspection type 89?
Looking forward for the favourable reply
Thanks
Sachin
Hi Sachin,
For 201-P u can have GI inspection type 02.Again it is not a stock relevant like 89.
Regards,
Nitin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.