Resource Consumption

Former Member
0 Kudos

Hello all.

I have a multimixed resouce, this resouce has 10 capacities. For example, if each machine produces 10 kg / h(kilogramas by hour) and i have 10. My max/hour is 100kg/h.

Now, i try to create a Plan. Order of 100kg. When SCM creates an Order uses only first machine, in our example needs 10 hours to produce the order.

Changing our resource config to Time-Continuos, same example needs 1 hour.

My question is:

Is there way to use this 2 methods? because our client needs changing the planning by order. And not for Resource.

Thanks.

Best Regards

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hello all.

There is a field called "Splitting" in ECC and it's goes to SCM in the PPM.

Is There way to turn this field in a variable?

Best Regards

Former Member
0 Kudos

I found one structure with the field.

CT_MODE.

With this i can modify and create a variable consumption.