Dears

In inspection instuction (print report)

there is area called minimum Plausibility and maximum Plausibility

What actually it refer to

How system calculiting these numbers

Faisal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Rfere food explaination

muhamed_faisal
Active Participant
0 Kudos

Dear sujit

I have plausibility factor of 200% in in plant level setting

i created a MIC with upper limit 40 and lower limit as 30

system showing plausibilty factore as upper- 80 and lover 15

it mean that system can accept value between the this range (80 to 15)??

but when i make RR system not accepting any value >40 and <30

so still i have a confuse over the concept of that

Faisal

Former Member
0 Kudos

Do not get confuse

We specify Plausibilty limits @ MIC level ( we directly specify the limit (lower/upper) )

or

@ plant level setting , we specify the %

So

In case if you specify

USL :20

LSL: 10

You can specify Lower plausibilty limit as 9 & upper as 21.

System will issue message for any value < 9 & >21.

Try to use the @ char level & check