on 09-09-2011 7:19 AM
Hi,
I have implemented CCMS between my SAP ECC system 6.0 and SAP SRM7.0. How can i generate CCMS report for my SRM system from ECC system. Can any one please tell me the steps to configure CCMS between my ECC (CEN) system and SRM 7.0 ABAP system.
Regards,
Pradeep J
Hi,
I just want to know what is the general steps to configure CCMS between ECC 6.0 and SRM 7.0. My ECC system is ABAP stack and it is not a double stack. I am not trying to put the two thing, i just want to verify whether i have implemented the CCMS in a correct way.thats the reason i have asked you for the configuration steps.The link provided by you in the reply is i have used earlier, can you please provide some real time scenario.
Regards,
Pradeep J
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pradeep,
If you have followed the standard document - it should work as expected.
Real time application for CCMS could be numerous, depends on your requirements usage.
I tried the CCMS to generate auto alerts via E-mail for system availability:
Regards,
Srikishan
> I have implemented CCMS between my SAP ECC system 6.0 and SAP SRM7.0.
>Can any one please tell me the steps to configure CCMS between my ECC (CEN) system and SRM 7.0 ABAP system.
Hi,
Contradicting statements.
However check the link for CCMS Configuration:
http://www.sdn.sap.com/irj/sdn/index?rid=/webcontent/uuid/30237989-0901-0010-70a4-944691eb5e52 [original link is broken]
Ideally the CEN system should be a double stack i.e. best if its a solution manager.
Regards,
Srikishan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
25 | |
12 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.