cancel
Showing results for 
Search instead for 
Did you mean: 

Integration between PM and PS

Former Member
0 Kudos

We have integration between PM and PS and we need to capture the cost incurred in PM order and for that WBS has been assigned in PM order and budgeting has been done in CJ20N and the cost is not reflected in project at

Edited by: SUDHAKAR P V on Sep 7, 2011 3:49 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Moderator message - Duplicate post locked