Delete the inspection plan assigned to an inspection lot

former_member494495
Active Contributor
0 Kudos

Hi

The inspection plan is assigned to automatically

How to Delete the inspection plan assigned to an inspection lot ?

I need to assign later after changing the inspection plan

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

tanuj_parikh
Active Participant
0 Kudos

Hi,

If Result Recording is not started i.e. lot is in REL mode, goto QAC3-Reset Sample Calculation, give Inspection Lot no. and Save. This will bring the Inspection Lot in CRTD mode.

Tanuj Parikh

Regards,

former_member494495
Active Contributor
0 Kudos

Hi

I did the same already and brought to CRTD

but only the sample is reset

still inspection plan is found assinged

tanuj_parikh
Active Participant
0 Kudos

Hi,

Harikrishna has replied the procedure. Try to follow it.

You can go for new Inspection Plan with new counter and assign in Change Inspection Lot.

Regards,

Tanuj Parikh

former_member494495
Active Contributor
0 Kudos

Hi

Thanks.

But you are telling to assing the inspection plan.

My Question how i can delete an assinged inspection plan from an inspection lot

The status is

CRTD CHCR PASG

Former Member
0 Kudos

You can not delete a Inspection plan attached to inspection lot,you can only remove it .Hence status will become CRTD.

anand_rao3
Active Contributor
0 Kudos

Hi Alagesan,

No need to delete. The step at which you have arrived is correct. Just follow this further.

1. Carry out necessary changes in inspection plan through QP02

2. Go to QA02. Go to Insp. Specifications tab.

3. Here is the confusion. Even if you see the group number has already been assigned, just click on Task list/spec.

4. It assigns the same group again with modified parameters with same group.

Just try it!

Regards,

Anand Rao

former_member494495
Active Contributor
0 Kudos

Hi

I did the same

The Lower spec & upper spec if modified, the modified value is appearing in results recording

But i added one more operation it is not appearing in results recording

Former Member
0 Kudos

Hi,

Reverse the inspection lot through MBST in case the inspection type is stock relevant and do the Goods receipt again.

Then your problem will be solved.

Regards

Hari

anand_rao3
Active Contributor
0 Kudos

Hello Alagesan,

Thatu2019s correct. I also experienced the same and could not find the exact way for doing this.

However if the requirement is so essential to add these parameters in the same inspection lot, I think additional characteristics can serve this purpose as an alternative. Go to results tab, and click on + symbol. It cannot add operation but at least would ensure the parameters of second operation are getting covered in this lot.

Anyhow you have changed the inspection plan in QP02 by adding one more operation, it would take effect from next lot.

Try if works for you!

Regards,

Anand

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Go to QAC3- Reset sample calculation, put the inspection lot number and save.

Now make the necessary changes to the inspection plan, or even create a new inspection for the material. (QP01/QP02)

Now go to QA02- Change inspection lot, Click on inspection specifications, the new inspection plan will be assigned.

Make sure that you change the key date to today's date (the date when you made changes to the inspection plan)

Then click on sample so that sample size will be created.

Now go can do results recording with the new inspection plan

Regards

Hari