on 09-07-2011 6:27 AM
Hi experts,
I have to maintain a material with Base unit of measure EA in Basic Data View,
Sales unit of measure is DZ In sales org. data 1
and when orders are created with dozens and picking will be done in dozens so as PGI
But i want to maintain another unit of measurement for the same material as in BUNDLES (where 1BUNDLE= 10 EA)
Now i have maintained this unit of measure in ADDITIONAL DATA in material master (Basic data 1 tab)
IF there is a delivery of 10 dozens then system should show 12 Bundles in Billing document .... Just wondering do any one have any idea how can i maintain this....
Thank you....
Hi,
Pls note we have three controls in material master
two fields are in sales sales org1 BUM and SU
thired field control in Plant data/stor.1 Unit of Issue
here i will explain with example
in the 1st two field taken as .....
Base Unit of measure as EA
Sales unit as RM
and in the issue unit taken as PAL
one reem = 500 each
One PAL = 50 Reems this is the calculation
created sales order with 25000each(in the line item we need to change EA manually)
deliver 25000
in the billing also it is 25000ea
but in the condition value it will show RM wise calculation.
you take any unit in the sales order line item pricing will come correctly only this conversion will chage as per material master.
pricing with respect to sale unit ie RE.
hope your issue will solve
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.