HI All,

If the vendor QM Sytem has expired ,then the sytem should not allow posting of goods receipt (MIGO) by using the functionality of Quality Info record or any other methods of control like vendor master or purchasing info record.

Please provide your valuable suggestions

Thanks & regards,

rajesh

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

The QM system is only designed to control the creation of the PO against vendors with the specifiied QM system.

If you want to block receipt at the time of MIGO, you will need to use a MIGO user exit to do a check against the vendor's QM system to verifiy it ihas not expired since the purchase order was created.

FF

Answers (1)

Answers (1)

Former Member
0 Kudos

Use User exit

QBCK0003 |Extended QM check for goods receipt