on 09-06-2011 10:45 AM
Dear Gurus,
I have created a project ID WITH 2 LEVELS OF wbs AS BELOW
P/AT11
P/AT11-LAND
P/AT11-LAND-CV
P/AT11-LAND-ME
But if i later change the 2nd Level WBS from P/AT11-LAND TO P/AT11-LNBL and tried to save, the system allowed it to save, where as the 3rd level WBS are still P/AT11-LAND-CV,
Finally there is mismatch in 2nd level and 3rd level WBS so system should not allow, is there any setting for this pls guide.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
please create a validation with user exit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As you mentioned, you have changed P/AT11-LAND to P/AT11-LNBL, which is not matching with any other WBS element in the structure. Otherwise system will give error message "WBS Element XXXXXXX already exists".
Warm regards,
Murthy.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In OPSK tcode check if the "Edit" check box is ticked. If not, maintain the tick and then check with a new project.
Regards,
Gokul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.