cancel
Showing results for 
Search instead for 
Did you mean: 

Upgrade - SAP will not restart during MAIN_NEWBAS/STARTSAP_NBAS phase

Former Member
0 Kudos

We are upgrading from 4.7 to NW 7.0 (SP#5)

SAP will not restart during the phase MAIN_NEWBAS/STARTSAP_NBAS

We had to manually apply the kernel (NW 7.2 -#63 - NON UC). This looks OK when we calll DW -version. The T03 system will not start either through the upgrade tool or manually. There is no useful log in

\usr\sap\T03\DVEBMGS15\work

The upgrade tool reports this error.

Checks after phase MAIN_NEWBAS/STARTSAP_NBAS were negative!

Last error code set: RFC call to subst_get_uvers failed with key

RFC_ERROR_COMMUNICATION (open): SAP_CMINIT3 : rc=20 > Connect to SAP gateway failed Connect_PM GWHOST=CSIAS9, GWSERV=sapgw15, SYSNR=15

LOCATION CPIC (TCP/IP) on local host with Unicode

ERROR partner 'CSIAS9:3315' not reached

TIME Wed Aug 31 15:09:36 2011

RELEASE 720 COMPONENT NI (network interface)

VERSION 40 RC -10

MODULE nixxi.cpp

LINE 2898

DETAIL NiPConnect: 165.156.101.209:3315

SYSTEM CALL connect

ERRNO 79 ERRNO TEXT Connection refused

COUNTER 550

Thanks

Matt

Accepted Solutions (0)

Answers (2)

Answers (2)

0 Kudos

Hello Matthew,

I forwarded your customer ticket to the IBM i development support. Please follow the instructions in the answer.

Best regards,

René Lang

Former Member
0 Kudos

Thanks Rene, I have updated the ticket with the required information. In the mean time I am interested if anyone else had had a similar problem during an upgrade. We did have an initial error with the crtsidusr command ( setting CLASSICUSERCONCEPT + removing some of the SPCAUT) seemed to fix that. At this point the upgrade failed and we had to manually APYSAPKRN, the log shoewed it wanted the NON UC which was odd as we are including the UC in the upgrade.

Thanks

markus_doehr2
Active Contributor
0 Kudos

Did you install the proper runtime?

1540608 - SAP system does not start after applying SAP kernel

Markus