Hi,

When I go to the DP planning area it let me create new ratios, but the SNP planning area does not le t me create them. What should I do?

What is the best way to simulate scenarios in SNP?

- One Planning area with two versions? Or two planning areas?

Thanks a lot

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

The best way is to have multiple versions for simulation.

SNP reads live cache data and hence you can also use multiple planning area.

Vipul

Former Member
0 Kudos

Hi

Can I create new ratios for an already SNP initialized planning area like for the DP planning areas?

Thanks a lot