WBS Settlement to COPA

Former Member
0 Kudos

Hi Experts,

We have a requirement to have WBS Line item settlement to COPA...We are facing an issue with the COPA report where we need to fetch the report based on the Cost Element; currently single Cost Element is getting updated in the COPA document after WBS settled to COPA, this is due to the multiple line items posted against WBS Element which got settled to single line in to the COPA.

Please suggest a way where we can accommodate this Line Item settlement to COPA (Revenue and Expenses postings included in the WBS Element) so that multiple line items will be created in COPA with respective Cost Element updated.

Note: I am not looking for AUC Line item settlement.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member230675
Active Contributor
0 Kudos

Hope you have referred SAP help on Allocation Structure and PA Transfer Structure. If not please check.......

Former Member
0 Kudos

Thanks for your reply... do you mean to say that Allocation structure and PA Transfer structure configuration would help in this situation...or you just want me to check those configuration.

Former Member
0 Kudos

Hi,

Yes, your requirement can be achieved by using those two features. So please go through the documnetation and if you are face any specific problem then revert with details.

Regards

Sreekanth

former_member230675
Active Contributor
0 Kudos

Yes, please check and make sure it as you required, otherwise please maintain it.