I am trying to transfer SNP PDS for master receipes from R3 to APO.

Issue description::

The operation is not getting transfered correctly , some system default operation "010 generated Operation (from Planned Delive)" is getting generated in APO, also activity and resource capacity is not getting transfered. This situation exist for one plant 1000, for other plant 1100 the SNP PDS created correctly.

i have following points:

1. Is there some customizing setting missing on R3 or APO side for plant 1000 tbefore SNP PDS transfer

2. What need to be checked on master recipes data in R3,

i have checked on below points

1. FG Materials and all the Component Material to be in APO in a Active Integration Model.

2. BOM & Routing and Production Version setup correctly.

3. The Routing Operations have to Relevant to 'SCHEDULING'.

4. Try deleting the existing Integration model for materials & re-create new IM & activate.

Please help me to send SNP PDS correctly to APO to take heuristic run.

Regards

Gajendra

Edited by: Gajendra_APO on Aug 23, 2011 1:14 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

m_manimaran
Active Contributor
0 Kudos

Hi,

It is good that you have given your already checked points.

Please check the following things also and try to retransfer the PDS.

1. Check your resource in ECC, whether you have maintained the Process formula.

2. Check you have maintained some values in Master Recipe for processing time

3. Check whether the resource has been transferred for your plant 1000 to APO and an active IM exists.

4. Also check the type of the resource transferred to APO. It should be a single-mixed/ multi-mixed or bucket resource.

Hope this will help you to solve the issue.

Regards,

Manimaran M.