Hi Guru,

We receive job work items through MIGO and MB31.

During MIGO , create one inspection lot w/o inspection lot stock tab and again create one more inspection lot at the time of MB31.

Pl. suggest any setting so that only one inspection lot will create after MB31.

Regards,

Rakesh Patel

Accepted Solutions (0)

Answers (10)

Answers (10)

Former Member
0 Kudos

Hi,

Mr. Anand,

Pl. guide me.

Thanks in advance.

Regards,

Rakesh Patel

Former Member
0 Kudos

Hi,

Mr.Anand,

Movement type is 101 and Inspection types are 01,04 and 08.

regards,

Rakesh Patel

Former Member
0 Kudos

Hi,

Mr. Anand

We are doing MB31 for the same material.

Pl. guide me so that i can do the setting of one out of below mentioned two options.

1 ) I want to give decision of materials at receipt stage i.e. after MIGO and handover materials to store.

After that store will do MB31 against production order as and when required. OR

2 ) Inspection lot will not generate after MIGO.

regards,

Rakesh patel

anand_rao3
Active Contributor
0 Kudos

Hi Rakesh,

Which movement type you are using in MB31? Is it possible for you to mention how many and which inspection types you have currently assigned to your material in QM view?

Regards,

Anand

anand_rao3
Active Contributor
0 Kudos

Hi Rakesh,

Kindly excuse me but thereu2019s a confusion to me, if you can please clarify the same.

1. First transaction that you are carrying out is MIGO for 101 movement I guess.

2. For this movement you are observing that inspection lot stock is not getting generated. The probable one of the reasons for this according to me is, goods receipt against cost center using item category K in PO.

3. When you inward such material against K, the stock gets consumed at the same moment you inward it. This is standard behaviour of SAP.

My question is,

1. MIGO is done for say material XYZ. (the stock is not visible in MMBE if you have inwarded against cost center.)

2. Now MB31 is done for which material? Is it the same material or different? If you have activated 04 inspection type to the material whose production you are declaring then system will generate the lot for it in 04.

3. MB31 is generally used for goods receipt against production order.

I am unable to establish the link between MIGO and MB31 here.

Regards,

Anand Rao

Former Member
0 Kudos

Hi,

There is no stock type for MIGO and for MB31 it is " E - orders on hand".

regards,

rakesh patel

Former Member
0 Kudos

Inspection type 01 is also activated and movement type is 101.

regards,

Former Member
0 Kudos

You will be having two different material documents. one with MIGO and the other with MB31 for the Material-Batch-plant- Order Combination, pls check for both the documents, what is the Stock type in there ?

It should be Quality Inspection

Regards,

Shyamal

Former Member
0 Kudos

We are doing confirmation against sales order through MB31.

We have activated 04 inspection type.

regards,

Former Member
0 Kudos

Hi

Pls activate inspection type 01 also. and try to simulate the scenario again.

If it doesn't work pls provide more inputs like what is movement type u r using?

Regards,

Shyamal

muhamed_faisal
Active Participant
0 Kudos

Hello Rakesh

Can you explain what is the purpose of doing MB31 after doing MIGO

Both are doing goods receipt?

In material mater what are the inspection you activated?

Faisal

0 Kudos

Please check the Purchase order is made against cost center or order.

If YES then it will not create stock posting tab.

Madhan

0 Kudos

Please check the Purchase order is made against cost center or order.

If YES then it will not create stock posting tab.