Assing inspection manually

muhamed_faisal
Active Participant
0 Kudos

Dears

My material was activated with 01 inspection type

I didn't create any ispection plan for this materail

I have created a purchase order and done Goods receipt

now system created a inspection lot with status CRTD CHCR SPRQ

Now i need to assign a inspection plan manully to this lot

Please tell me how i can do that

Faisal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Faisal,

Check the quality plan of the material in QP03 with valid date Lot size and status as release(usage5 and status 4), check deletion indicator.

Please reset the inspection lot go to QA02 assign the task list to lot and then have the status of the lot as REL and then do the UD.

Regards

Hari

Answers (3)

Answers (3)

Former Member
0 Kudos

Check The Usage of the Task List. it should be 5.

Also check the status as released - 4

Thanks

Sachin

anand_rao3
Active Contributor
0 Kudos

Dear Faisal,

Refer this [Link|http://wiki.sdn.sap.com/wiki/display/PLM/InspectionlotswithCRTDstatus-Causesand+Remedies] also.

Regards,

AR

Former Member
0 Kudos

Assuming that you have all the master data pre-reqs completed like Material Master QM view, Inspcetion Plan with the valid key date, Usage, Status etc....proceed as below

Go to the inspection lot under change mode.

Click Insp. Spec tab

Click Task List/spec tab.(This will assign the plan to the lot)

Click Sample tab and then click SAmple Calc icon to calculte the sample.

SAVE.

The relevant inspection plan will get assigned and your Inspection Lot will be in REL status.

Also, if you search the forum you will see a lot of threads related to this topic.

Naik

muhamed_faisal
Active Participant
0 Kudos

Hi

i try to clik task list specfication button in change inspection lot tab but system through the error like follow

-


No inspection plan could be found

Message no. QA278

Diagnosis

A task list could not be found for the selection criteria. The

inspection setup for this material in the quality management view of the

material master defines an inspection with a task list.

-


but i have a inspection plan already

Thanks in advance

Faisal

Former Member
0 Kudos

hi faisal,

1. First check ur usage and status for task list is 5, 4 respectivly.

2. Check same material is assigned to the inspection plan.

3. Check your date of lot cration which should always not before task list creation.

if these all conditions are met then definatly lt will be released, check and feel free to ask if still problem is not solved.