on 08-18-2011 2:17 PM
Hi,
Deficit of BA Unrestricted-use 525 M : BA0000001 JIC1 BPSL BA0000001
Message no. M7021
Diagnosis
Shortfall below the specified stock level or quantity amounting to 525 M.
System Response
If the message is an error message (E), the above is not allowed.
If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
Procedure
In the case of a warning message, check the quantity entered.
In the case of an error message, change the quantity or terminate processing.
Note:
The abbreviations in the short text of this message can have the following values:
BA = batch
OR = order
PL = plant
PR = previous period
PU = purchasing document
RE = reservation
SL = storage location
VC = consignment stock from vendor in storage location
While doing the PGI i am getting the Error , i checked in MMBE and MB51 & MB52 also STOCK is available and also stock already assigned to SO
please guide me how to solve
Regards,
Prasanna
Hi,
Again i am Getting one more issue like
Order cannot be delivered (see long text)
Message no. VL461
Diagnosis
Possible reasons include:
The copy conditions specified in Specify copy control for deliveries do not allow the order to be delivered.
The order is blocked for delivery.
The order document is incomplete.
Procedure
Pay attention to any notes that may be recorded in the log.
You can display the copying requirements defined for this transaction in Customizing.
59 10 Only 0 M of material BA00000006 available
59 10 An item with no delivery quantity is not permitted. Item will be deleted.
here 59 is the my Sale order number and 10 is line item number and BA00000006 is the material
here one important point is what we have done is ( I don't know whether is correct way or not )
Under this material BA00000006 (Finished material ) we assigned different Finished materials with different quantity and different Batch numbers and also final one BA00000006 is having one more batch and at the time of delivery i am getting the error what i mentioned above
Please guide me how to solve the issue
if any one want further clarification please revert me
Regards,
Prasanna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi... Looking at the message it seems that the stock is going below specified stock level.
Shortfall below the specified stock level or quantity amounting to 525 M
Please check the pending deliveries qty made for that material. I t seems that delivery are made than the Unrestricted stock avilable at plant level.
Thanks
DK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for Reply DK,
I checked all the deliveries and one more point is once stock is there in the storage location after that we assigned the stock to that particular SO, that is the reason system is accepted TO days date ( MTS )
Even i tried with less Qty like out of 525 meters i picked 100 qty but still system is showing the Same error
Why system is not allowed to do PGI
Regards,
Prasanna
Edited by: prasanna_sap on Aug 20, 2011 7:39 AM
HI,
Now I am explaining what i have done based on that guide me whether it is correct way or is there any other way
1. We are raising the SO for Finished material ,after that we completed the production it is normal case and also we assigned to that stock to the particular Sale order and also we have batch determination
2.But client will send the material (BALE) like clubbing of 3 or more finished material with partial quantity under one BALE and they want to select only BALE and he will raise Commercial Invoice and Excise Invoice for that we created New material for BALE as a finished material and De-assign batch to the SO stock and assign the Those batch Stock under BALE number (Again we treated as a finished material )
3. After that again i raise the SO with Finished material as a BALE with Quantity but system is not accepting Delivery level is it correct manner to do this process
please guide me how to solve the issue if any one want clarification please revert
Regards,
Prasanna
I am sure you would have already ckecked, but still just a suggestion:
Check the dates, I mean date of Actual Delivery Date, & Stock Availability Date...
Hope this helps,
Thanks,
Jignesh Mehta
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for Reply Mehta,
I checked what you mentioned i raised the 2 SO and system has confirmed 2 days date and also i checked in Schedule line its showing today Confirmed date
Through VL10C i combined 2 SO and i have done the Background system has generated delivery number
Again i went to VL02N i have done picked qty through BATCH
I am getting the Error while Click on the PGI button
Please guide me how to solve the issue
Regards,
Prasanna