Common inspection plan

muhamed_faisal
Active Participant
0 Kudos

Dears

I have requirment as below

I need to have a common inspection plan in the system

So i dont want to create any inpection plan against material

when ever inspection lot was created is it possible to assign a common inspection plan

the thing is that i dont want to create more master data in the system

If it is possible please tell me how we can achive this

Thanks in advance

Faisal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Faisal,

Instead of creating inspection plan for every material.

You can create one inspection plan and assign the same plan to all materials.

This can be done in the Material Assignment in QP02 transaction.

You can keep on adding materials day by day to this for the same group and group conuter.

If you want to create in mass, hope you can create a BDC

Refer the below link

http://help.sap.com/saphelp_46c/helpdata/en/8d/4103aff89511d283de0000e829fdb3/content.htm

Thanks and Regards

Hari

Edited by: Harikris_83 on Aug 18, 2011 5:56 PM

Answers (1)

Answers (1)

krishnamurty_madduri
Contributor
0 Kudos

Hi,

You can have only one inspection plan and assign all materials to it. No problem. However, you need to confirm that this serves the QM purpose of your company/products. If it is OK- no problem.

In course of time, as new materials are created, you can assign them to this Inspection Plan.

I don't think you need any BDC for this. Simple Excel will serve your purpose - unless you have materials in thousands.

Regards, KrishnaM

former_member42743
Active Contributor
0 Kudos

You will need one plan however for each UOM you intend to inspect with.

If all your materials use the KG UOM than you can use one plan.

But if you have different UOM's, you need one for each UOM.

FF