on 08-18-2011 10:24 AM
Dear All
User requirement Inspection lot to be generated with Alternative unit of measurement instead of base unit,
Regards
You can create an inspection plan with an alternate UOM in it and assign the material to it if the alternate UOM is defined in the material master.
Nothing special about it. Create the plan. Assign the material.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear FF
Thanks for the valuable answer,we know that it will come to CRTD but we dont want that it should assign the plan with respect to UOM of Workscheduling (Confirmation done for the material which as different UOM other then base UOM).Inspection plant should be assigned with confirmed material UOM instead of Base UOM.
Eg. Base Unit Meter(M) Material ocde - X confirmed with altenative UOM TON(TO).
So System should pick Inspection plan with TO instead of M.It should assign the plan automatically with system status REL CALC SPRQ.
Thanks and Regards
The standard system will never take the UOM of confirmation into consideration.
You will probably have to utilize the user exit to meet your requirement.
QPAP0002 - Enhancement for material/plan assignment, plan selection.
You can assign the material to multiple plans, (i..e one plan for each UOM that is expected to be used plus one in the BUOM).
Then use the exit to determine the UOM of confirmation and select the plan. All UOM's must still be defined in the material master.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.