on 08-11-2011 9:21 PM
Hi everybody,
Sometimes there are cases we have one material master with 2 types of material usage. This material can be bought like consumption (material usage 2) and sometimes this same material can be bought like asset (material usage 3).
If I choose one of this options in material master, when I create the purchase order based on this material, I couldn't change the material usage for the right option (consumption or asset).
Do you know how can I change this option during the creation of Purchase orders?
Thanks, Camila
Edited by: Camila Peralta on Aug 11, 2011 10:22 PM
Hi ,
Suggest to post this question in SAP MM forum.Each material assigned to material group based on material group and material type you can create production orders.
Thanks,
Ramesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
10 | |
5 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.