cancel
Showing results for 
Search instead for 
Did you mean: 

Re: More than one material with QM Notification

Former Member

Dear All,

Is it possible to assign more than one material with QM notification.

Regards,

Vivek

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Query Resolved.

former_member207800
Active Contributor
0 Kudos

Denis answered correctly.

By ECC6 EhP4, you can assign several batch, serial number, inspection lot, order, delivery item within a material at a notification.

But you cannot assign several material at a notification.

Regards

Luke

Former Member
0 Kudos

Thanks evrery body.

I was having the same opinion. I have raised the same with SAP. Waiting for their response.

Thanks again.

Regards,

Vivek

former_member42743
Active Contributor
0 Kudos

I believe that in 6.0 EHP 4 SAP has provide that capability. But I'm not 100% sure.

FF

Former Member
0 Kudos

I am using 6.0 EHP 4 now, assigning different batch within one material to one Q-notification is possible, but not different material.

Former Member
0 Kudos

As per my knowledge & discussed many tmes in forum ,it not possible.