cancel
Showing results for 
Search instead for 
Did you mean: 

two inspection

muhamed_faisal
Active Participant
0 Kudos

Dears

i have a scenario like below

for the raw material for incoming inspection two different type of inspection i want to do

first inspection: Quality inspection

it is need to be trigger at always when a GR is happen

Second inspection:Quantity couning(number counting)

It need to be trigge for each 100 lot....for this i need to use DMR

How to achive it as both usage is 5 in inspection plan

Thanks in advance

Faisal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Just giving re-thought to your question,

Say you have activated 01 inspection type & z01 inspection type.But when 100th inspection comes how do you expect system to create Two lots at same time for same inspection lot origin.

I do not think its possible unless you have different PO or material document or inspection origin.

You have to find out different solution such as manual inspection lot of Inspection lot origine 89 etc for 100th lot.

Think over!!

muhamed_faisal
Active Participant
0 Kudos

Dear Sujit

Before closing this thread let me put what i understand from your answer

It is not possible to trigger two inspection lot from a single origin(01 inspection type)

Pls confirm

Faisal

Former Member
0 Kudos

It is not possible to trigger two inspection lot from a single origin(01 inspection type)

Its not possible at same instance.Means from same PO,same material document number

Answers (1)

Answers (1)

Former Member
0 Kudos

Explore user exit

QAAT0001 ---> Inspection type determination different from variant 01

muhamed_faisal
Active Participant
0 Kudos

Hi

is it possible achive this if we create a new inspection type for any of the inspection?

User exit documentation is giving somthign differect what i expect

Faisal