on 08-03-2011 8:09 AM
Dear All,
i want to install Baseline package for chemical on my ECC6 with EHP4 IDES server on different Client.
i have download BP for Chemical version V1.603.
i do not know how to apply or install BP in running IDES server.
please advice how to install Baseline package
Thanks and Regards,
Hiten
Check
Note 1271033 - SAP Best Practices for Chemicals US V1.603
Markus
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Markus,
I have upgrade my patch level and applied Baseline package through SAINT.
on Uploading the Installation Data, i am getting error "Data upload terminated due to errors"
"/SMBA0/V_005_B_B17D_J01 SMBA0_V_005_B_B17D_J01_100.TXT File is not available. Filename is:SMBA0_V_005_B_B17D_J01_100.TXT"
i have downloaded 51040873_BP_FILES_IN_604V7 for data file, and copied into local server.
Please advice
Regards,
Hiten
Hi Hiten,
Are you trying to install 'Baseline Package' or the 'Best Practices (BP) for Chemicals' ?
BP for Chemicals is available for ECC6 EhP3 (v603), not for EhP4. And as Markus has already suggested you the note, BP for chemicals shouldn't/can't be installed on EhP4 (604). Please go through the note and technical installation document.
Baseline package is available for EhP4 as well.
Thanks
User | Count |
---|---|