Dears

I have a skip lot by DMR

this lot i found rejected

1.so is it possibel to do RR for this skip lot

2.For this skip lot i give UD as rejected ,but next lot is also skipped

is the system repose in right way(actualy in DMR setting i give if one lot is rejected stage change to initial)

Faisal

Edited by: Muhamed Faisal on Jul 30, 2011 2:31 AM

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

It is possible to do results recording on skip lot. No issues and nothing special.

What happens with regards to the DMR depends on when and what has happenned and when the quality level is updated, (at lot creation or lot UD). Any exisitng lots will not be retroactively updated if you process an earlier skip lot.