on 07-29-2011 2:16 PM
Hello Experts,
Greetings.
Can someone help me out with complete sampling procedure(step by step) for any kind of new product devlopment(I.e garment new style no.xyz) in SAP?
At the moment we are doing all the activities outside the system.
Any help would be much appriciated.
Best Rgds
Nitin
Hi,
Sampling Procedure has nothing to do with a new product development. Once a material is mapped in Material Master, with QM view- Inspections mapped in it, you need Sampling procedure to draw samples for the Lot that is under inspection. I quote from the above link Sujit gave: "A sampling procedure defines the rules that specify how the system calculates the sample size and it contains information about the valuation of an inspection characteristic during results recording (attributive, variable, manual, etc.)".
A request: This forum will serve its purpose best only when you go through the help notes in help.sap.com and do try it in the system and then seek help for any problem that you face. Regards, KrishnaM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The steps would be: New Product developed>Map it in Material Master> Assign QM View with Inspection types specified>Sampling Procedure>Indicate Sampling type (Fixed/100% inspn/Sample percentage/use Sampling scheme)>Select Valuation Mode (this is very important because: the characteristic is evaluated based on this valuation mode. Pl. note that there are several Statistical options in addition to Manual mode)>Select if necessary: Multiple Samples>Click on the left top corner "Sample">indicate the sample size here.
Thus, you create Sampling procedure which is assigned to each characteristic in the Inspection Plan.
Hope it is clear now. Regards, KrishnaM
Hi
if you are looking for sampling procedure Sujit link will be very help full
But if you are searching for a new product design.. pls consider following points as per my understanding by the help of expert in this forum...
If any new change for the existing material or entire new material
create a physical sample by using QPR1
prerequisites:-
activate inspection type 15 in materiel master
create quality plant with usage as 9
create inspection lot by QPR2
make inspection and record result and give usage decision
Hope this may help some extend if you are really looking for a new product development
pls revert back with further queries
Faisal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.