on 07-19-2011 10:49 AM
Dear All,
I just doing scheduling of maintenance plan with T.Code IP10.
But there are some problem like if i am schedule in current date like 19.07.2011 for 6 months then system calculate the same like (system calculate like below)
Plan Date
1) 19.08.2011
2) 19.09.2011
3) 19.10.2011
4) 19.11.2011
5) 19.12.2011
but i want (actual require)
1) 19.08.2011
2) 19.09.2011
3) 19.10.2011
4) 19.11.2011
5) 19.12.2011
6) 19.01.2012 (Actual require)
for information, i have maintain maintenance strategies with T.Code IP11
in that i used Scheduling indicator = Time - Key Date
Strategy unit = Month
Factory Calendar = All day Working Calender
Thanks,
Sandip Shaktavat
Hi,
As per the list, you wanted the system to create Maintenance orders 19th of every month. But, in fact: you wanted the 19th to be the actual required date (ie you wanted the equipment to be ready by that date. Am I right ?) If so, you need to use the other parameters in Maintenance Plan Scheduling Parameters tab. Use Horizon period to prepone/postpone the creation of Maintenance order so that, your equipment will be ready on the required date. Just try and revert. Regards, KrishnaM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
11 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.