on 07-14-2011 3:41 PM
Hi
We are doing a sale order for a material that is storage in two storage location.
Storage location A:
2 units
Storage location B:
3 units
We did a sale order for 5 material. Stock availability asigned 5 unit in one position of the purchase order. Then the system create just one delivery for 2 units.
Which procedure or customizing we have to do to get two deliveries, one for each storage location.
Thanks in advance for the help
Regards
Enzo
Hi,
As per your requirement my understanding is that you need two create two deliveries based on storage locations which is not possible.
A delivery split based on storage location. Standard we can have split based on different shipping points,different incoterms.
Based on Storage location you need split the delivery.
Which is a work around solution.
Regards,
Saju.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks SAJU SOM
We need to create two deliveries from one sales order, that have quantities for differents storage locations.
Example:
Sales order A: 5 units
We have, 2 in storage location C and 3 in storage location D under same plant. The storages locations are in differents places, so we need two deliveries, one from C and the other one from D.
I suppose that this situation is normal and occurs in many companies.
So, we have to create a sales order with 2 positions, or the system split the deliveries during deliveries creation?
I think the system should split the positions automatically in the sales order creation.
Thanks for your help
Regards
Enzo
Hi
I advice you to move the material from srorage location B to storage location A using movement tpe 311 in t.code MB1B.
Then you can create a single delivery for the material without having to split it.
If you dont have autorization for MB1B, take the help of your MM consultant.
Hope this solves your issue.
Regards
Madhu
Edited by: Madhu Naidu on Jul 15, 2011 8:30 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Two options are there
1) Sale Order will have to be created based on storage location which means for same material code, there will be multiple line items
2) Try with Delivery exit V02V0002
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Enzo... Do you need two deliveries or one delivery.
System doen't split deliveries automaticlly. If you are doing delivery streight from order and if your order has only one line item for 5 then delivery will not take place as none of the Sloc has the required qty. Now for two deliveries you need to create two line items for each Sloc qty and you can enter the S.loc in the slaes order line item itself. And u ahve to delive the order two times for 2 deliveries.
But if u need one delivery split qty. in dlivery screen as per SLOC QTY.
Hope this will help you.
Thanks
DK
HAVE A NICE DAY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.