on 07-13-2011 2:42 PM
Hi experts,
I'am working on a GRC 10.0 (AC) implementation and when creating a conncetor to the SAP ERP, we have no error nor problem.
But, when I try to run the SYNC programs, lets say GRAC_ROLEREP_PROFILE_SYNC, GRAC_PFCG_AUTHORIZATION_SYNC, etc. I get the following error: Processing for connector XXXXXXXX, Correctly define the logical connection in CCITS, Role sync failed with error. And when trying to run it in background a get the job cancelled and with the following error: Connector is not properly configured in common component setting.
Yeah, I know what you are thinking...the problem is the connector!!! That's what I also think. But when I go to the IMG and look at the custominzing, cant find anything that makes me believe that the connector is not properly configured. At least following all the procedures in the configuration guide.
I have upgraded up to Support package 4.
Lets take a look at the customizing:
In IMG/GRC/Common Component Settings/Integration Framwork/Create connectors
I Have created an RFC ABAP connection (with the same logical name as the ERP), and tested the RFC connection and works fine.
In IMG/GRC/Common Component Settings/Integration Framwork/Maintain connectors and connection types
I have the connection types definitions by default. In Define connectors I have one entry with my target connector (the one created in the last step), connection type=SAP, Source connector=empty, Logical port=empty and max no of bg=3
Could be the source connector and logical port fields?? Cause I dont know what to fill the fields with...
Well hope somebody can give me a hand on this.
Regards,
Hi Asheesh
Thank you very much for your answer.
I finally solved the problem.
What did I do? I ran the program in EN language instead of ES and it ran.
The thing is...what happens if I need the GRC 10.0 in Spanish? Probably there might be some new SP comming up, bring the support for non english implementations.
Best regards and points for your help!!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Experts,
I'm using the SP5.
I'am facing the same issue with the job GRAC_PFCG_AUTHORIZATION_SYNC.
I tried to run it in background and foregroung in several langages but it doesn't solve my issue:
Unable to locate connector xxxxxxx
PFCG authorization sync failed with errors
My connector's setting seems to be right as I can run a risk analysis and see results.
Other synchronisation jobs (GRAC_REPOSITORY_OBJECT_SYNC for example) works fine.
Have anyone an idea ?
Best regards
Have checked executing the program GRAC_PFCG_AUTHORIZATION_SYNC. This program checks the connector field in table GRACCONNSTAT. If this table in empty , system will throw message ‘Unable to locate Connector’. You should maintain this table using SPROàGRCàAccess Controls àMaintain Connector settings.
Thanks
ARD
Hi
As per the latest document available on BPX you need to maintain logical port in " Maintain connector ".
Logical port need to be same as Source connector .
DO lets us know if this fix your problem .
Thanks & Regards
Asheesh