cancel
Showing results for 
Search instead for 
Did you mean: 

Fixing Interval in Resource - Error

Former Member
0 Kudos

Hello.

Running my Heuristic for Schedule(SAP001) i received a lot of this error messages, from all orders/activity.

@5C\QError@ Activity 11922266|0010||G is fixed because it is in the

fixing interval of the resource

I ran /sapapo/rest02 for LC errors, it's 100% correct.

I ran one heuristic to remove all fixing interval in /sapapo/cdpsb0. I tried inside the plannig board and the error continues.

Inside the planning board, SCM don't show none fixing interval,

but still the same error when MRP run.

Best Regards

Marcelo

Accepted Solutions (0)

Answers (1)

Answers (1)

0 Kudos

This error can also be raised when an activity which is not entirely inside the planning period needs to be rescheduled (e.g. in the detailed scheduling planning board, try to drag&drop an activity which is in the display period but outside the planning period).

Former Member
0 Kudos

Obrigado Tiago.