Dear SAP Gurus,
I have one doubt regarding Sample calculation for Inspection lot. Please give your inputs on this.
The sceanrio is like this -
1. A Quality Plan is created with one operation (operation # 0010)
2. To this operation 0010 in the quality plan, 2 MICs are assigned.
3. For the 1st MIC, a 100 % inspection sampling procedure is assigned.
4. For the 1st MIC, a sampling procedure with Percentage sample (Sampling type - 400) is assigned.
My question is - When inspection lot is created after GR from purchase order, which sampling procedure will be used to calculate the Sample size that we see in QA03 under Sample tab?
Regards,
Nitin
Maximum of the sample size the two mic's ,which I presume will be 100% of the lot size .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.