We are configuring SRM7.0 with ECC6 ( Ehp4) having Classic Scenario
We already done initial upload of all Mat Type , Mat Grps, Material & Service Master data successfully. Now one Mat Grp is added in ECC, and I am tring to replicate this delta objectsin A3AS , but the DNL_CUST_PROD1 is in Running status from long time ( in R3AM1) where Source Site is ECC & Destination is SRM.
In ECC , these is no any queue stuck either in SMQ1 or SMQ2.
In SMWP in SRM, it is showing message with Red color Blocked queues: Client 212 Blocked outbound queue: Client 212 Q name DNL_CUST_PROD1 status SYSFAIL dest EDACLNT112 in section R3AI/R* Start Queues for Loads from OLTP .
In SRM, thes is nothing stuck in Inbound Queue in SMQ2, but I am afraid , Queue R3AI_DNL_CUST_PROD1 is stucked in Outbound Queue SMQ1 , showing destination ECC sytem , with status SYSFAIL !!! I tried to UNLOCK & Activate this queue , but no use.
1. I am wondered We are imporing Mat Grp from ECC to SRM, so in SRM ssytem, the Queue for Mat Grp ( a nd other objects should be Inbound ( i.e. SMQ2), then how/why the queue stuck in the Outbound Queue ( SMQ1) ?
2.Can anyone please suggest what should be the problem a nd solution on same .
Thanks in advane.
NAP
Resolved
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
NAP,
Did you run report BBP_PRODUCT_SETTINGS_MW after replication? Pl do this asap.
The flow is correct...first a request is sent from SRM to ECC, hence the entry in outbound queue of SRM, then material transfer starts from ECC to SRM.
Nikhil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Nikhil/All.
No.We did not ran the report BBP_PRODUCT_SETTINGS_MW in SRM after replication (I beleive no one ran it other than me). We ran it while doing middleware setting before initial upload. Here issue with mat Grp replication and not Materials.
One more thing, we just done patching iactivity in last week. Is this may the cause ?
Please suggest.
Thanks
NAP
Thanks Nikhil. I varified all steps as per Note 720819 and all seems okay. Even Material Master is replicaing in SRM successfully.
Issue is we even unable to see the error log also. In SMQ2 stuck Queue for DNL_CUST_PROD1 from SYSFAIL ststus we can not guess the issue.Do we other hints to look ?
I am not cleared on the processing of Queues, i.e. how this imported objects looking into SMQ2 O/B Queue , it will be very appricated if you can explain in detail how these Queing works in SRM for importing Mat Types, Mat Grp & Material master data?
Thanks in advane.