cancel
Showing results for 
Search instead for 
Did you mean: 

change default SL after UD

Former Member
0 Kudos

Dear QM experts,

I am having a scenario,

Production from Storage location1 (SL1) by REM- Mov. Type 131 ---> Receipt at (SL2) -


> QA at SL2 and after QA material goes to same SL which is SL2 .

Here i need to send material after quality to any other SL (say SL5) in place of same SL(SL2) .

Please let me know that how to do it.

Thanks in advance,

Regards,

Ashutosh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

If stock is in QI & inspection lot UD not take then you can use QAC2.

If not then you can use MB1b-->301 mvt type if stock is in unrestricted.

Former Member
0 Kudos

Dear Sujit,

This is not required for one time, i need to make it automatic , means system itself takes material for QA from one SL (say SL2) and after UD Posts to another SL (say SL5) .

Please help.

Regards,

Ashutosh

Former Member
0 Kudos

Generally storage location defined in the order(production/purchace etc) is considered to be the default location for the stock posting.

while doing stock posting you can change storage location Dynamically...but automatic its not possible.

At the most you can put a check before UD ( whether material posted to desired storage location or not ) through user exit QEVA0010 |UD: Usage decision check

Answers (0)