on 07-06-2011 12:53 PM
Hi ,
Our client want to implement Make to Order scenario.
Can anyone pl guide about the configuration required in SD?
Thanks in advance.
Pallavi
Hi,
1) You need to have a material with item category group 0001 = MTO (Normal Item)
In MM01, basic data tab, Gen.Item category field 0001= MTO , 0002 for configurable material
2) In MTO availability check - checking group is 02 (individual requirement) in General/Plant tab.
3) Create an order VA01 there you will see item category as TAK, schedule line as CP, and requirement type as KE
In VOV7 TAK Billing relavence is A and pricing is X.
In VOV6 for CP the movement type is 601
4) MB1C to initialize the stock with special stock indicator E (means 561E)
5) MMBE to check the stock if it has been created or not.
Lastly do the delivery picking and billing.
Regards,
Sridhar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.