If in the matrial master if we not activated for auto UD in this sense we wantt o fill any data in

QCC)>basic setting>plant dependetnt qm setting>inspection lot completion tab>Automatic usage desicion

Muhamed

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

1. Activating UD in Material master is mandatory incase you want auto UD .

The inspection lots must meet the following conditions:

All characteristics have been completed

None of the characteristics have been rejected

No defects have been recorded, or quality notifications created

The waiting time set in Customizing must have elapsed.

Inspection lots with the status skip lot can also be taken into account.

2. In customising in plant level setting you enter the delay time for skip lots ( Dynamic Modification)

3. Before the system can make an automatic usage decision for inspection lots with skip status, the delay time (in minutes) must have already expired since the lot was created.

4. You shoud activate skips allowed in the material master then .

5. Waiting time in hours is entered in customising such that auto ud is done by the system once this time has elapsed

You can trigger auto UD manually QA10 or through Job planning QA17