I am in the version 7.0 of SRM and I need to send the contract PCTR of SRM for ECC 6.0.
- Connections SM59 is well;
- Attribute CT_PROC_TY of the structure is well;
- Transaction Types and Number Screech is well;
- IDOCs BLAORD y defined COND_A in WE20 is well;
Did I forget something?
All creates the contract and I try to distribute the same, the mistake below it is exhibited:
" Could not determines back-end system goes contract "
Determination of Back End is well.
Some idea?
Rgs,
Pedro
Hi, Pedro:
It is SRM Extended Classic mode?
You want to transfer the contract to ECC?
Please check the ECC and SRM both sides of the scope of the contract number.
Sarah