Where exactly to check if the characteristic to be checked is a shor term one or a long term one ?
Regards
Fernando Luz
QP03->enter material->plant->enter>go to char level>select mic/char->go to control indicator--->check whether "Long term inspection is ticked" if not its short term.
There could be another ways also but this is how we see from inspection plan.