Hi Experts,

On transaction V_V2, when I enter a material number on the selection screen, the re-scheduling is not done although the stock has been updated for that material.

Can anybody tell me how to overcome this issue? I would like to perform the rescheduling by specifying the material number on V_V2.

Thanks,

Vitz.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Which checking Group is assigned in the Material Master.

Best Regards,

Ankur

former_member239066
Participant
0 Kudos

Hi Ankhur,

It is not based on the checking group in the material master. In V_V2 a flag is set when you specify the material number on the selection screen. And when that flag is set, no re-scheduling is performed.

Thanks,

Vitz.

former_member562530
Active Participant
0 Kudos

Hi Vitz,

Do you still working on this error?

Did you tried to run the transaction V_V2 with "Simulation" flag empty?

Kind Regards,

Gabriel Santana

Lakshmipathi
Active Contributor
0 Kudos

Not sure why it was not happening in your case. May be you can try with V_RA

thanks

G. Lakshmipathi