on 06-28-2011 7:26 AM
Note material is Configurable material and Strategy is Make to order with configurableT-CODE VF02
billing date 03.06.2011
NO STANDARD COST ESIIMATE COULD BE FOUND MATERILAL (check the attachment)
in sale order
Pricing date 11.03.2011
Purchase order 09.03.2011
there are two items inthe sales order
our billing document for item 10 (material code is available in attachment)
steps taken
1.check MM03 costing 2
cost estimate not found
My requrement is
In material master MM02/mm03 in the costing tab cost estimate should be updated
I want do the billing
In OVZG costing data
sales order costing,automatic costing and marking,costing method -product costing
Hello
Refer following link:
-
Regards
JP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.