cancel
Showing results for 
Search instead for 
Did you mean: 

no standard cost estimate found in material

former_member222080
Participant
0 Kudos

T-CODE VF02

billing date 03.06.2011

NO STANDARD COST ESIIMATE COULD BE FOUND MATERILAL

in sale order

Pricing date 11.03.2011

Purchase order 09.03.2011

there are two items inthe sales order

our billing document for item 10

1.check MM03 costing 2

cost estimate not found

Accepted Solutions (1)

Accepted Solutions (1)

eduardo_hinojosa
Active Contributor
0 Kudos

Hi

Check if the material is new, you need a production orders and the valuation is standard. Perhaps you need to do the product costing. Without cost you dont have VPRS condition. Look for help from PP and/or CO consultants.

Regards

Eduardo

Answers (1)

Answers (1)

former_member204407
Active Contributor
0 Kudos

Hi Suresh

Have you maintained standard price for material in Accounting1 tab in MMR

I hope it will be useful to you.

regards,

Krishna.

former_member222080
Participant
0 Kudos

thanks a lot