on 06-23-2011 1:17 PM
Is there any additional settings need to be done on new PI 7.1system or in fresh SLD to start the development from scratch?
Is there any check list for that?
Specification about the SWCV and PRODUCT will be installed by basis during the installation or that need to installed / imported post installation of PI system?
Thanks,
Pushkar
once you complete post instaltion steps correctly PI System will be ready.
after that you have to created Products and software components and Technical system and Busisness system......................
search in sdn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
On the top of that refer too as well.
7.1 post installation process.
Note 817920 - XI Readiness Check 3.0/7.0, 7.1
chirag
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
this covers most of it
http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/00004f25-6190-2b10-2c8b-fa419234c28b
once your installation is followed by post installation, the system is ready to use.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
10 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.