System :SRM 7.0 Extended Classic scenario.

Scenario: We never copied our Dev Client fro Production. Recently our Dev ECC system has been copied from Production

But ,because of memory constraints we cannot do the same to SRM system.

Also our Org is replicated from ECC to SRM.

Objective: 1 Need to synch up the Org of ECC (Dev) to SRM(Dev)

Query 1: How do we overwrite the entire org setup of SRM .

Query2 : Can we make use of concept of Plan version here so that we end up doing wrong ,so that we could switch back to

the earlier version)

(Any inputs on how can we make this possible)

Query 3: Is it possible to transport only the Org structure from either Production (SRM) or Develepoment (ECC).

While doing all this we have a major issue

Issue1: We could figure out that the number ranges setup in our Dev org structure of SRM are totally differnt from ECC Dev.

Ex: Postion number are 65XXXXXX in ECC where as 60XXXXXXX in SRM.

So when we perform PFAL ,it fails .

Any kind of inputs for us to brainstorm on this.

Regards

Sarath

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Sarath,

If we are using active version then change the number ranges in OONR against 01$$

Check the IDOC settings for message type HRMD_ABA. it must be transafer IDOC immediately.

Get the all active organization unit (O) from HRP1001 table in SAP and run PFAL in update mode for object (O) and let me know the result. It will replicate all orgnaization unit and position which fas assigned to above