Hi,
We are using the SNP heuristic to plan production and we need to offset the planned production by one bucket (day). So if the demand falls on a Friday, the planned production should be in the Thursday bucket. I have looked at various master data for this, including period factor etc. but I cannot see a way to do it without somehow introducing a dummy operation into the PDS, which I do not want to do. I have also tried 1 day GR/GI time but the heuristic seems to ignore this completely.
All suggestions welcome!
Hi,
You can define a fixed duration of one day in R3 and CIF the PV.
Thanks,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Tested the following things in PPM.
1 Changed the fixed duration to 5 days in PPM.
2.Demand created at factory on 25.07.2011.
3. Took a Location heuristic run.
4. SNP Planned Orders created with start date 23.07.2011 and end date as 28.07.2011
Note: my factory is working for 6 days.
can you check in your SNP Global settings whether you are ignoring the GR processing time.Gr processing time will be honoured in SNP runs.
Thansk,
nandha