Hi All,
I have a following situation.
The each bin capacity is 5 pallets and picking of last pallet isnu2019t working. We have to increase the stock in the DC by receipting material to that storage location / storage type.
Please suggest any workaround for this situation.
Thanks,
Aravind
What is the stock removal strategy you are using? Did you try LIFO - L in the putaway strategy.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
No. The picking strategy is FIFO (F). It has some custom logic to look for oldest quant based on GR date. I am wondering if it is an standard issue. If the storage type has 10 pallets on two bins i.e. 5 pallets on each pallet, system allows to pick 9 pallets and fail to pick the last one. Once the stock is replenished with few pallets on this storage, the pallet which wasn't picking earlier will be picked fine.
Thanks,
Aravind